Lick Run substation interconnection queue
1 active project totaling 60 MW in the PJM queue, plus 3 with terminal status (shown grayed).
4 PJM queue filings name Lick Run as the point of interconnection, all in Somerset County, PA.
Target commercial operation dates as filed run from Dec 2019 to Dec 2028 (4 filings). 1 active filing targets a date after November 27, 2026.
1active projects
60active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AF1-143 | Rockdale Solar | 115 | 60 | Solar | Engineering and Procurement | Dec 2028 |
| AC2-122 | Lick Run 115kV | 115 | 19 | Solar | Withdrawn | Dec 2019 |
| AF2-141 | Lick Run 115 kV | 115 | 8 | Battery | Withdrawn | Jul 2023 |
| AF2-163 | Lick Run 115 kV | 115 | 0 | Solar | Withdrawn | Oct 2022 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Somerset County, PA
- Statler Hill: 2 active, 53.6 MW of 2 filed
- Meyersdale North: 3 active, 35.1 MW of 5 filed
- Frostburg: 3 active, 19.6 MW of 6 filed
- Somerset: 2 active, 11.8 MW of 14 filed
- New Baltimore (Stony Creek): 1 active, 10.5 MW of 2 filed
- Rockwood: 1 active, 8 MW of 5 filed
- Scalp Level: 1 active, 6.3 MW of 6 filed
- Hooversville: 2 active, 5.9 MW of 4 filed
- TBD: none active of 20 filed
- Somerset-Allegheny: none active of 6 filed
- Berlin: none active of 4 filed
- Allegheny-New Baltimore: none active of 2 filed
- Allegheny-Somerset: none active of 2 filed
- Arnold: 1 active, 0 MW of 2 filed
- Bedford North-Central City West: none active of 2 filed
- Central City West: none active of 2 filed
- Garrett: none active of 2 filed