Tabernacle substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 7 with terminal status (shown greyed).

0active projects
0active MW
7total filed
Queue IDProjectkVMWResourceStatus
W4-062 Tabernacle 69kV 69 6.8 Solar Withdrawn
AF2-174 Tabernacle 12 kV 12 4.6 Solar Withdrawn
AC2-050 Seneca Energy 12 3.8 Solar Withdrawn
Y1-017 Tabernacle n/r 3.8 Solar Withdrawn
AB1-165 Tabernacle 12kV 12 1.1 Solar Withdrawn
AE2-141 Tabernacle 12 kV 12 1.1 Solar Withdrawn
AE2-145 Tabernacle 12 kV 12 0.8 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.