Sunbury-Dalmatia substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Sunbury-Dalmatia as the point of interconnection, all in Northumberland County, PA.
Target commercial operation date as filed: Apr 2028 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG1-259 | Boyles Run Solar | 69 | 6.7 | Solar | Withdrawn | Apr 2028 |
| AG1-260 | Boyles Run Solar | 69 | 6.7 | Solar | Withdrawn | Apr 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Tracked changes at this substation
2 changes to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-10-12 | AG1-259 | Status change | n/a | Pending Termination → Withdrawn |
| 2026-10-12 | AG1-260 | Status change | n/a | Pending Termination → Withdrawn |
Other PJM queue substations in Northumberland County, PA
- Hamilton: 2 active, 500 MW of 5 filed
- Milton: 1 active, 43.5 MW of 4 filed
- Derry Tap-Derry Bus: 1 active, 8.4 MW of 2 filed
- Derry Tap-Derry Bus III: 1 active, 4.1 MW of 2 filed
- TBD: none active of 20 filed
- Watson: none active of 4 filed
- Sunbury-Milton: none active of 2 filed