Landis substation interconnection queue
1 active project totaling 325 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Landis as the point of interconnection, all in Cumberland County, NJ.
Target commercial operation dates as filed run from Oct 2021 to Dec 2030 (2 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: AEC (1 filing).
1active projects
325active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1769 | Landis 138 kV | 138 | 325 | Battery | Active | Dec 2030 |
| AE1-161 | Landis 138 kV | 138 | 20 | Battery | Withdrawn | Oct 2021 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Cumberland County, NJ
- Orchard - Cumberland: 2 active, 500 MW of 2 filed
- Cumberland: 2 active, 97.5 MW of 10 filed
- Vineland: 2 active, 80 MW of 4 filed
- Clayville: 2 active, 64.5 MW of 3 filed
- Carll's Corner: 1 active, 63.8 MW of 3 filed
- Sherman Ave - West Vineland: 2 active, 32 MW of 2 filed
- Sherman Ave: 1 active, 12.4 MW of 3 filed
- Carlls Corner: 1 active, 4.8 MW of 8 filed
- Fairfield Township: 1 active, 3.8 MW of 2 filed
- TBD: none active of 20 filed
- Minotola: none active of 5 filed
- Newport: none active of 4 filed
- Bridgeton: none active of 3 filed
- Churchtown-Cumberland: none active of 2 filed
- Fairton: none active of 2 filed
- Millville: none active of 2 filed
- Newport-South Millville: none active of 2 filed
- Roadstown: none active of 2 filed
- Stow Creek Township: none active of 2 filed
- Upper Deerfield: none active of 2 filed