Landis substation interconnection queue

1 active project totaling 325 MW in the PJM queue, plus 1 with terminal status (shown grayed).

2 PJM queue filings name Landis as the point of interconnection, all in Cumberland County, NJ.

Target commercial operation dates as filed run from Oct 2021 to Dec 2030 (2 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: AEC (1 filing).

1active projects
325active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
C01-1769 Landis 138 kV 138 325 Battery Active Dec 2030
AE1-161 Landis 138 kV 138 20 Battery Withdrawn Oct 2021

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Cumberland County, NJ

All 94 PJM queue filings in Cumberland County, NJ.