Scalp Level substation interconnection queue
1 active project totaling 6.3 MW in the PJM queue, plus 5 with terminal status (shown grayed).
6 PJM queue filings name Scalp Level as the point of interconnection, all in Somerset County, PA.
Target commercial operation dates as filed run from May 2003 to Oct 2025 (6 filings).
1active projects
6.3active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| I15 | Scalp Level 115kV | 115 | 9.9 | Gas | Withdrawn | May 2003 |
| AG1-241 | Scalp Level 23 kV | 23 | 6.5 | Solar | Withdrawn | Dec 2022 |
| AH2-360 | Scalp Level 23 kV | 23 | 6.5 | Solar | Withdrawn | Dec 2024 |
| AF1-218 | Scalp Level 23 kV | 23 | 6.3 | Solar | Withdrawn | Dec 2020 |
| AF2-221 | Stony Creek Solar | 22.9 | 6.3 | Solar | Suspended | Oct 2025 |
| AG1-033 | Scalp Level 23 kV | 23 | 3.2 | Solar | Withdrawn | Dec 2021 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Somerset County, PA
- Lick Run: 1 active, 60 MW of 4 filed
- Statler Hill: 2 active, 53.6 MW of 2 filed
- Meyersdale North: 3 active, 35.1 MW of 5 filed
- Frostburg: 3 active, 19.6 MW of 6 filed
- Somerset: 2 active, 11.8 MW of 14 filed
- New Baltimore (Stony Creek): 1 active, 10.5 MW of 2 filed
- Rockwood: 1 active, 8 MW of 5 filed
- Hooversville: 2 active, 5.9 MW of 4 filed
- TBD: none active of 20 filed
- Somerset-Allegheny: none active of 6 filed
- Berlin: none active of 4 filed
- Allegheny-New Baltimore: none active of 2 filed
- Allegheny-Somerset: none active of 2 filed
- Arnold: 1 active, 0 MW of 2 filed
- Bedford North-Central City West: none active of 2 filed
- Central City West: none active of 2 filed
- Garrett: none active of 2 filed