Scalp Level substation interconnection queue
1 active project totalling 6.3 MW in the PJM queue, plus 5 with terminal status (shown greyed).
1active projects
6.3active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| I15 | Scalp Level 115kV | 115 | 9.9 | Gas | Withdrawn |
| AG1-241 | Scalp Level 23 kV | 23 | 6.5 | Solar | Withdrawn |
| AH2-360 | Scalp Level 23 kV | 23 | 6.5 | Solar | Withdrawn |
| AF1-218 | Scalp Level 23 kV | 23 | 6.3 | Solar | Withdrawn |
| AF2-221 | Stony Creek Solar | 22.9 | 6.3 | Solar | Suspended |
| AG1-033 | Scalp Level 23 kV | 23 | 3.2 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.