1 active project totalling 1.9 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
1.9active MW
3total filed
Queue IDProjectkVMWResourceStatus
AF1-126 Cookstown 230 kV 230 50 Battery Withdrawn
W2-037 Cookstown 34.5kV 34.5 2.7 Solar Withdrawn
W1-129 Jacobstown Solar Farm 34.5 1.9 Solar In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.