Cookstown substation interconnection queue

1 active project totaling 1.9 MW in the PJM queue, plus 2 with terminal status (shown grayed).

3 PJM queue filings name Cookstown as the point of interconnection, all in Burlington County, NJ.

Target commercial operation dates as filed run from Nov 2011 to Oct 2022 (3 filings).

1active projects
1.9active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AF1-126 Cookstown 230 kV 230 50 Battery Withdrawn Oct 2022
W2-037 Cookstown 34.5kV 34.5 2.7 Solar Withdrawn Nov 2011
W1-129 Jacobstown Solar Farm 34.5 1.9 Solar In Service May 2014

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Same name on other Substation Scout pages

Other sources that print a substation named “Cookstown” in NJ. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.

Other PJM queue substations in Burlington County, NJ

All 118 PJM queue filings in Burlington County, NJ, including 2 more substations.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first