Substation Scout

Allegheny-Somerset substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AF1-232 Allegheny-Somerset 115 kV 115 104 Hybrid Withdrawn
AH1-203 Turnpike Solar 115 42 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.