Allegheny-Somerset substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name Allegheny-Somerset as the point of interconnection, all in Somerset County, PA.

Target commercial operation dates as filed run from May 2022 to Dec 2027 (2 filings).

Transmission owner as filed: PENELEC (1 filing).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AF1-232 Allegheny-Somerset 115 kV 115 104 Hybrid Withdrawn May 2022
AH1-203 Turnpike Solar 115 42 Solar Withdrawn Dec 2027

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Somerset County, PA

All 107 PJM queue filings in Somerset County, PA.