Kanawha, WV interconnection queue
4 active projects totalling 13.2 MW in the PJM queue, plus 8 with terminal status (shown greyed).
4active projects
13.2active MW
12total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH2-043 | Cabin Creek 138 kV | 138 | 140 | Hybrid | Withdrawn |
| AH2-278 | Cabin Creek 138 kV | 138 | 100 | Battery | Withdrawn |
| AH1-426 | Gilboa-Jones Branch 138 kV IV | 138 | 64.6 | Battery | Withdrawn |
| AH2-209 | Cabin Creek 138 kV | 138 | 63 | Hybrid | Withdrawn |
| AG2-656 | Kanawha River - Carbondale 138 kV | 138 | 60 | Solar | Withdrawn |
| O37 | Belle 46kV | 46 | 14 | Gas | Withdrawn |
| AD1-149 | Carbondale 69 kV | 69 | 8.3 | Hybrid | Withdrawn |
| R82 | Kanawna River #1 | n/r | 5 | Coal | In Service |
| R83 | Kanawna River #2 | n/r | 5 | Coal | In Service |
| Y3-025 | Charleston Clean Energy | 12 | 3.2 | Gas | In Service |
| AH2-134 | TBD 34.5 kV | 34.5 | 0 | Solar | Withdrawn |
| V1-023 | Charlston LF | 12 | 0 | Gas | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.