Todd substation interconnection queue

5 active projects totalling 96.9 MW in the PJM queue, plus 11 with terminal status (shown greyed).

5active projects
96.9active MW
16total filed
Queue IDProjectkVMWResourceStatus
C01-1646 Todd 69 kV 69 50 Battery Active
AB2-172 Richfield Solar and Storage 69 19 Solar In Service
AE1-087 Richfield Solar and Storage 69 16 Battery Withdrawn
AI2-176 Todd 69 kV 69 14.5 Solar Withdrawn
C01-1642 Todd 69 kV 69 14.5 Solar Active
AG2-092 Todd 69 kV 69 11 Solar Withdrawn
W4-078 Todd 25kV 25 7.6 Solar Withdrawn
X3-008 Dorchester County Solar 1 Project 69 7.6 Solar In Service
AI2-177 Todd 25 kV 25 5.8 Solar Withdrawn
C01-1650 Todd 25 kV 25 5.8 Solar Active
G03 Todd 69kV 69 5 Gas Withdrawn
AH1-316 Todd 25 kV 25 4.4 Solar Withdrawn
AA2-147 Todd 12kV 12 2.7 Solar Withdrawn
AC1-228 Todd 25kV 25 1.1 Solar Withdrawn
AC2-005 Todd 25kV 25 1.1 Solar Withdrawn
AD2-095 Todd 69 kV 69 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.