Todd substation interconnection queue
4 active projects totaling 46.9 MW in the PJM queue, plus 12 with terminal status (shown grayed).
Target commercial operation dates as filed run from Dec 2002 to Apr 2029 (16 filings). 2 active filings target a date after November 27, 2026.
Transmission owner as filed: DPL (5 filings).
4active projects
46.9active MW
16total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1646 | Todd 69 kV | 69 | 50 | Battery | Withdrawn | Apr 2029 |
| AB2-172 | Richfield Solar and Storage | 69 | 19 | Solar | In Service | Jan 2024 |
| AE1-087 | Richfield Solar and Storage | 69 | 16 | Battery | Withdrawn | Apr 2024 |
| AI2-176 | Todd 69 kV | 69 | 14.5 | Solar | Withdrawn | Dec 2021 |
| C01-1642 | Todd 69 kV | 69 | 14.5 | Solar | Active | Apr 2028 |
| AG2-092 | Todd 69 kV | 69 | 11 | Solar | Withdrawn | Dec 2021 |
| W4-078 | Todd 25kV | 25 | 7.6 | Solar | Withdrawn | Jun 2013 |
| X3-008 | Dorchester County Solar 1 Project | 69 | 7.6 | Solar | In Service | Jul 2021 |
| AI2-177 | Todd 25 kV | 25 | 5.8 | Solar | Withdrawn | Jul 2021 |
| C01-1650 | Todd 25 kV | 25 | 5.8 | Solar | Active | Apr 2028 |
| G03 | Todd 69kV | 69 | 5 | Gas | Withdrawn | Dec 2002 |
| AH1-316 | Todd 25 kV | 25 | 4.4 | Solar | Withdrawn | Dec 2025 |
| AA2-147 | Todd 12kV | 12 | 2.7 | Solar | Withdrawn | Sep 2016 |
| AC1-228 | Todd 25kV | 25 | 1.1 | Solar | Withdrawn | Mar 2018 |
| AC2-005 | Todd 25kV | 25 | 1.1 | Solar | Withdrawn | Mar 2018 |
| AD2-095 | Todd 69 kV | 69 | 0 | Battery | Withdrawn | Dec 2021 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Tracked changes at this substation
1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-09-28 | C01-1646 | Terminal status | 50 | Active → Withdrawn |
Other PJM queue substations in Kent County, DE
- Cartanza: 1 active, 309.2 MW of 7 filed
- Clayton: 2 active, 153 MW of 3 filed
- Dover: 1 active, 98 MW of 3 filed
- Harrington: 4 active, 39 MW of 8 filed
- Cedar Creek I: 2 active, 15.1 MW of 2 filed
- Cedar Creek II: 2 active, 15.1 MW of 2 filed
- Kent-Harrington: 2 active, 8 MW of 2 filed
- TBD: none active of 20 filed
- Milford: none active of 4 filed
- New Meredith: none active of 2 filed
- South Harrington: none active of 2 filed
Other PJM queue substations in Dorchester County, MD
- East New Market: 1 active, 35 MW of 5 filed
- Vienna: none active of 4 filed
- Airey: none active of 2 filed
- Dorchester County: none active of 2 filed
Other PJM queue substations in Anne Arundel County, MD
- Waugh Chapel: 1 active, 490 MW of 5 filed
- Brandon Shores: 2 active, 410.4 MW of 5 filed
- Riverside: 3 active, 250 MW of 5 filed
- Pumphrey: 1 active, 155 MW of 4 filed
- Wagner: 1 active, 0 MW of 5 filed
Site Scanner