Burlington substation interconnection queue

9 active projects totalling 452.1 MW in the PJM queue, plus 15 with terminal status (shown greyed).

9active projects
452.1active MW
24total filed
Queue IDProjectkVMWResourceStatus
G11 Burlington 138kV 138 622 Gas Withdrawn
B09b Burlington 138kV 138 336 Gas Withdrawn
G12 Burlington 230kV 230 316 Gas Withdrawn
C01-1269 Burlington 230 kV 230 250 Battery Active
B09A Burlington 138 168 Gas In Service
AH2-127 Burlington 26 kV 26 18 Battery Withdrawn
G17 Burlington #10 n/r 16 Gas In Service
W2-060 Florence solar 26 7.6 Solar Withdrawn
W3-080 Cedar Lane 26 5.7 Solar In Service
AG1-190 Burlington 26 kV 26 5.5 Solar Withdrawn
AD2-204 Burlington 26 kV 26 5 Solar Withdrawn
W3-041 Springfield Solar 26 3.8 Solar Withdrawn
Y3-026 Burlington (L&D Solar) 26kV 26 3.8 Solar In Service
AC1-016 Burlington 26 kV Solar 26 3.3 Solar Withdrawn
Y3-048 Burlington Generating Station n/r 3 Gas In Service
Z2-001 Recovery Road Solar Farm 26 2.7 Solar Withdrawn
W4-103 North American Solar 26 2.7 Solar In Service
AG1-130 NAES 26 2 Battery Engineering and Procurement
AB2-121 Burlington 26kV 26 1.9 Solar Withdrawn
AE2-069 Burlington 13 kV 13 1.9 Solar Withdrawn
W3-026 1900 River Road 13 1.9 Solar Withdrawn
AF1-261 North American Solar 26 0.9 Solar In Service
AE2-099 Burlington 13.2 kV 13.2 0 Hybrid Withdrawn
X1-054 Mansfield Solar 26 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.