Burlington substation interconnection queue
9 active projects totalling 452.1 MW in the PJM queue, plus 15 with terminal status (shown greyed).
9active projects
452.1active MW
24total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| G11 | Burlington 138kV | 138 | 622 | Gas | Withdrawn |
| B09b | Burlington 138kV | 138 | 336 | Gas | Withdrawn |
| G12 | Burlington 230kV | 230 | 316 | Gas | Withdrawn |
| C01-1269 | Burlington 230 kV | 230 | 250 | Battery | Active |
| B09A | Burlington | 138 | 168 | Gas | In Service |
| AH2-127 | Burlington 26 kV | 26 | 18 | Battery | Withdrawn |
| G17 | Burlington #10 | n/r | 16 | Gas | In Service |
| W2-060 | Florence solar | 26 | 7.6 | Solar | Withdrawn |
| W3-080 | Cedar Lane | 26 | 5.7 | Solar | In Service |
| AG1-190 | Burlington 26 kV | 26 | 5.5 | Solar | Withdrawn |
| AD2-204 | Burlington 26 kV | 26 | 5 | Solar | Withdrawn |
| W3-041 | Springfield Solar | 26 | 3.8 | Solar | Withdrawn |
| Y3-026 | Burlington (L&D Solar) 26kV | 26 | 3.8 | Solar | In Service |
| AC1-016 | Burlington 26 kV Solar | 26 | 3.3 | Solar | Withdrawn |
| Y3-048 | Burlington Generating Station | n/r | 3 | Gas | In Service |
| Z2-001 | Recovery Road Solar Farm | 26 | 2.7 | Solar | Withdrawn |
| W4-103 | North American Solar | 26 | 2.7 | Solar | In Service |
| AG1-130 | NAES | 26 | 2 | Battery | Engineering and Procurement |
| AB2-121 | Burlington 26kV | 26 | 1.9 | Solar | Withdrawn |
| AE2-069 | Burlington 13 kV | 13 | 1.9 | Solar | Withdrawn |
| W3-026 | 1900 River Road | 13 | 1.9 | Solar | Withdrawn |
| AF1-261 | North American Solar | 26 | 0.9 | Solar | In Service |
| AE2-099 | Burlington 13.2 kV | 13.2 | 0 | Hybrid | Withdrawn |
| X1-054 | Mansfield Solar | 26 | 0 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.