Burlington substation interconnection queue
8 active projects totaling 450.1 MW in the PJM queue, plus 16 with terminal status (shown grayed).
24 PJM queue filings name Burlington as the point of interconnection, all in Burlington County, NJ.
Target commercial operation dates as filed run from Jul 2000 to Apr 2029 (21 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: PSEG (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| G11 | Burlington 138kV | 138 | 622 | Gas | Withdrawn | n/r |
| B09b | Burlington 138kV | 138 | 336 | Gas | Withdrawn | n/r |
| G12 | Burlington 230kV | 230 | 316 | Gas | Withdrawn | n/r |
| C01-1269 | Burlington 230 kV | 230 | 250 | Battery | Active | Apr 2029 |
| B09A | Burlington | 138 | 168 | Gas | In Service | Jul 2000 |
| AH2-127 | Burlington 26 kV | 26 | 18 | Battery | Withdrawn | Sep 2023 |
| G17 | Burlington #10 | n/r | 16 | Gas | In Service | Jul 2002 |
| W2-060 | Florence solar | 26 | 7.6 | Solar | Withdrawn | Feb 2014 |
| W3-080 | Cedar Lane | 26 | 5.7 | Solar | In Service | Nov 2016 |
| AG1-190 | Burlington 26 kV | 26 | 5.5 | Solar | Withdrawn | Dec 2021 |
| AD2-204 | Burlington 26 kV | 26 | 5 | Solar | Withdrawn | May 2019 |
| W3-041 | Springfield Solar | 26 | 3.8 | Solar | Withdrawn | Jul 2012 |
| Y3-026 | Burlington (L&D Solar) 26kV | 26 | 3.8 | Solar | In Service | Sep 2015 |
| AC1-016 | Burlington 26 kV Solar | 26 | 3.3 | Solar | Withdrawn | Mar 2021 |
| Y3-048 | Burlington Generating Station | n/r | 3 | Gas | In Service | Mar 2015 |
| Z2-001 | Recovery Road Solar Farm | 26 | 2.7 | Solar | Withdrawn | Jun 2018 |
| W4-103 | North American Solar | 26 | 2.7 | Solar | In Service | Aug 2016 |
| AG1-130 | NAES | 26 | 2 | Battery | Withdrawn | Jun 2027 |
| AB2-121 | Burlington 26kV | 26 | 1.9 | Solar | Withdrawn | Dec 2017 |
| AE2-069 | Burlington 13 kV | 13 | 1.9 | Solar | Withdrawn | Jun 2020 |
| W3-026 | 1900 River Road | 13 | 1.9 | Solar | Withdrawn | Mar 2013 |
| AF1-261 | North American Solar | 26 | 0.9 | Solar | In Service | Sep 2023 |
| AE2-099 | Burlington 13.2 kV | 13.2 | 0 | Hybrid | Withdrawn | Mar 2020 |
| X1-054 | Mansfield Solar | 26 | 0 | Solar | Withdrawn | Mar 2013 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Burlington (PSEG, 3 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes at this substation
2 changes to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-11-02 | AG1-130 | Status change | n/a | Pending Termination → Withdrawn |
| 2026-10-26 | AG1-130 | Terminal status | 2 | Engineering and Procurement → Pending Termination |
Other PJM queue substations in Burlington County, NJ
- Crosswicks: 2 active, 161 MW of 3 filed
- Southampton: 2 active, 81.1 MW of 7 filed
- Lumberton: 2 active, 6.8 MW of 14 filed
- Cookstown-Fort Dix: 2 active, 4.5 MW of 3 filed
- Trenton: 1 active, 3 MW of 6 filed
- Levittown: 2 active, 2.7 MW of 7 filed
- Mt. Holly: 1 active, 2.7 MW of 3 filed
- Wrightstown: 1 active, 2.3 MW of 4 filed
- Bustleton: 1 active, 2.1 MW of 5 filed
- Deptford: 1 active, 1.9 MW of 6 filed
- Cookstown: 1 active, 1.9 MW of 3 filed
- Cinnaminson: 2 active, 1.4 MW of 2 filed
- Medford: 1 active, 0.4 MW of 3 filed
- TBD: none active of 20 filed
- Camden: 1 active, 0 MW of 8 filed
- Tabernacle: none active of 7 filed
- North Hanover: none active of 4 filed
- Yardville: none active of 3 filed
- Cookstown-New Lisbon: none active of 2 filed
- Cox's Corner: none active of 2 filed
All 118 PJM queue filings in Burlington County, NJ, including 2 more substations.