Burlington substation interconnection queue

8 active projects totaling 450.1 MW in the PJM queue, plus 16 with terminal status (shown grayed).

24 PJM queue filings name Burlington as the point of interconnection, all in Burlington County, NJ.

Target commercial operation dates as filed run from Jul 2000 to Apr 2029 (21 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: PSEG (1 filing).

8active projects
450.1active MW
24total filed
Queue IDProjectkVMWResourceStatusTarget COD
G11 Burlington 138kV 138 622 Gas Withdrawn n/r
B09b Burlington 138kV 138 336 Gas Withdrawn n/r
G12 Burlington 230kV 230 316 Gas Withdrawn n/r
C01-1269 Burlington 230 kV 230 250 Battery Active Apr 2029
B09A Burlington 138 168 Gas In Service Jul 2000
AH2-127 Burlington 26 kV 26 18 Battery Withdrawn Sep 2023
G17 Burlington #10 n/r 16 Gas In Service Jul 2002
W2-060 Florence solar 26 7.6 Solar Withdrawn Feb 2014
W3-080 Cedar Lane 26 5.7 Solar In Service Nov 2016
AG1-190 Burlington 26 kV 26 5.5 Solar Withdrawn Dec 2021
AD2-204 Burlington 26 kV 26 5 Solar Withdrawn May 2019
W3-041 Springfield Solar 26 3.8 Solar Withdrawn Jul 2012
Y3-026 Burlington (L&D Solar) 26kV 26 3.8 Solar In Service Sep 2015
AC1-016 Burlington 26 kV Solar 26 3.3 Solar Withdrawn Mar 2021
Y3-048 Burlington Generating Station n/r 3 Gas In Service Mar 2015
Z2-001 Recovery Road Solar Farm 26 2.7 Solar Withdrawn Jun 2018
W4-103 North American Solar 26 2.7 Solar In Service Aug 2016
AG1-130 NAES 26 2 Battery Withdrawn Jun 2027
AB2-121 Burlington 26kV 26 1.9 Solar Withdrawn Dec 2017
AE2-069 Burlington 13 kV 13 1.9 Solar Withdrawn Jun 2020
W3-026 1900 River Road 13 1.9 Solar Withdrawn Mar 2013
AF1-261 North American Solar 26 0.9 Solar In Service Sep 2023
AE2-099 Burlington 13.2 kV 13.2 0 Hybrid Withdrawn Mar 2020
X1-054 Mansfield Solar 26 0 Solar Withdrawn Mar 2013

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

PJM planning mentions

A substation with the same name is named in PJM transmission planning materials: Burlington (PSEG, 3 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes at this substation

2 changes to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-11-02AG1-130Status changen/a Pending Termination → Withdrawn
2026-10-26AG1-130Terminal status2 Engineering and Procurement → Pending Termination

Other PJM queue substations in Burlington County, NJ

All 118 PJM queue filings in Burlington County, NJ, including 2 more substations.