Camden substation interconnection queue

1 active project totalling 0 MW in the PJM queue, plus 7 with terminal status (shown greyed).

1active projects
0active MW
8total filed
Queue IDProjectkVMWResourceStatus
A51 Camden n/r 258 Gas Withdrawn
AC2-193 Camden 26kV 26 10 Solar Withdrawn
W2-040 Preble Solar Energy 69 7.6 Solar Withdrawn
U2-060 Pennsauk LF n/r 5 Gas Withdrawn
AD1-027 Camden 26 kV 26 4.2 Solar Withdrawn
Y3-027 Camden (Cinnaminson Solar) 26kV 26 2.3 Solar Withdrawn
AB1-104 Camden 26kV 26 0 Solar Withdrawn
K04 Pennsauken Sanitary Landfill / Aluminum Shapes 26 0 Gas In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.