St. Barnabas substation interconnection queue
1 active project totalling 2.4 MW in the PJM queue, plus 2 with terminal status (shown greyed).
1active projects
2.4active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AD2-058 | Spectrum Solar | 13 | 2.4 | Solar | In Service |
| AE2-336 | St. Barnabas 13 kV | 13 | 1.9 | Solar | Withdrawn |
| AE2-337 | St. Barnabas 13 kV | 13 | 1 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.