Newport substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
AE2-091 Newport 69 kV 69 23 Solar Withdrawn
W1-089 Newport 69kV 69 6.8 Solar Withdrawn
AF2-172 Newport 12 kV 12 3.8 Solar Withdrawn
X1-092 Newport 12kV 12 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.