Silver Lake

Named in 3 PJM planning documents for 3 projects, from September 9, 2025 to July 7, 2026.

Existingdescribed as
COMEDzone
345 kV, 345KV, 345kVkV as printed
4mentions

Also printed as: Silver Lake Substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
345KV STATCOMS
ComEd-2024-014, ComEd-2024-022, ComEd-2025-005, ComEd-2025-011, ComEd-2025-013, ComEd-2025-015, ComEd-2025-016, ComEd-2025-020
Conceptual $472.0M 06/01/2031 Not printed 2026-07-07
TEAC
Customer in Hoffman Estates
ComEd-2024-016
Conceptual $84.8M 9/1/2028 612 MW 2025-09-09
TEAC
Customer in Grayslake
ComEd-2025-005
Conceptual $248.8M 6/1/2027 (Phase 1), 6/1/2029 (Phase 2), 6/1/2030 (Phase 3), 6/1/2029 (138KV System Reinforcement), 6/1/2030 (345KV Auto, 345KV Silverlake-Grayslake, 345KV Wayne-Tollway), 6/1/2031 (345KV Tollway-Grayslake) 1,550 MW 2026-07-07
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate $35.3 M → $472.0M 2025-09-09 2026-07-07
In-service date 5/1/2028 → 06/01/2031 2025-09-09 2026-07-07
Substations named LASALLE; PLANO → BRYON; CHARTER GROVE; HIAWATHA; ITASCA; SILVER LAKE; WAYNE 2025-09-09 2026-07-07
Cost estimate $174.8M → $248.8M 2026-03-10 2026-07-07
In-service date 6/30/2027 (Phase 1), 6/30/2029 (Phase 2), 6/30/2030 (Phase 3), 6/1/2029 (System Reinforcement) → 6/1/2027 (Phase 1), 6/1/2029 (Phase 2), 6/1/2030 (Phase 3), 6/1/2029 (138KV System Reinforcement), 6/1/2030 (345KV Auto, 345KV Silverlake-Grayslake, 345KV Wayne-Tollway), 6/1/2031 (345KV Tollway-Grayslake) 2026-03-10 2026-07-07
Substations named BEVERLY ROAD; GRAYSLAKE; HANOVER TAP; LIBERTYVILLE; SILVER LAKE; SPAULDING → GRAYSLAKE; HANOVER TAP BLUE; HANOVER TAP RED; LIBERTYVILLE; SILVER LAKE; SPAULDING; TOLLWAY; WAYNE 2026-03-10 2026-07-07

Every mention

DateDocumentProjectWhat the document says about it
2026-07-07 TEAC
Item 12 - ComEd Supplemental Projects p. 13
345KV STATCOMS “Install +/-350 MVAR 345KV STATCOM, 1-150 MVAR 345KV Capacitor Banks and four associated 345KV Circuit Breakers at Silver Lake Substation”
345KV
2026-07-07 TEAC
Item 12 - ComEd Supplemental Projects p. 9
Customer in Grayslake “Cut into existing 345kV Silver Lake – Libertyville line”
345kV
2026-03-10 TEAC
Item 08 - ComEd Supplemental Projects p. 7
Customer in Grayslake No role wording
345kV
2025-09-09 TEAC
Item 12 - ComEd Supplemental Projects p. 18
Customer in Hoffman Estates No role wording
345 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.