Substation Scout

Clifford Solar Substation

Named in 3 PJM planning documents for 1 project, from July 17, 2026 to October 6, 2026.

Existingdescribed as
JCPLzone
34.5 kVkV as printed
3mentions

Also printed as: Clifford Solar

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
EH Werner - Keyport 34.5 kV V48 Line Rebuild
JCPL-2024-038 · s3971.1
Not printed $42.10M 04/05/2030 Not printed 2026-10-06
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - JCPL Local Plan Submission of Supplemental Projects for 2026 p. 45
EH Werner - Keyport 34.5 kV V48 Line Rebuild “Replace substation conductor at Clifford Solar Substation”
34.5 kV
2026-10-01* SRRTEP Mid-Atlantic
JCPL local plan submission for 2026 RTEP p. 45
EH Werner - Keyport 34.5 kV V48 Line Rebuild “Replace substation conductor at Clifford Solar Substation.”
2026-07-17 SRRTEP Mid-Atlantic
Item 02 - JCPL Supplemental Projects p. 10
EH Werner - Keyport 34.5 kV V48 Line Rebuild “Replace substation conductor at Clifford Solar Substation.”
34.5 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.