Hanover Tap Red

Named in 1 PJM planning document for 1 project, on July 7, 2026.

Existingdescribed as
COMEDzone
138kVkV as printed
1mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Customer in Grayslake
ComEd-2025-005
Conceptual $248.8M 6/1/2027 (Phase 1), 6/1/2029 (Phase 2), 6/1/2030 (Phase 3), 6/1/2029 (138KV System Reinforcement), 6/1/2030 (345KV Auto, 345KV Silverlake-Grayslake, 345KV Wayne-Tollway), 6/1/2031 (345KV Tollway-Grayslake) 1,550 MW 2026-07-07
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate $174.8M → $248.8M 2026-03-10 2026-07-07
In-service date 6/30/2027 (Phase 1), 6/30/2029 (Phase 2), 6/30/2030 (Phase 3), 6/1/2029 (System Reinforcement) → 6/1/2027 (Phase 1), 6/1/2029 (Phase 2), 6/1/2030 (Phase 3), 6/1/2029 (138KV System Reinforcement), 6/1/2030 (345KV Auto, 345KV Silverlake-Grayslake, 345KV Wayne-Tollway), 6/1/2031 (345KV Tollway-Grayslake) 2026-03-10 2026-07-07
Substations named BEVERLY ROAD; GRAYSLAKE; HANOVER TAP; LIBERTYVILLE; SILVER LAKE; SPAULDING → GRAYSLAKE; HANOVER TAP BLUE; HANOVER TAP RED; LIBERTYVILLE; SILVER LAKE; SPAULDING; TOLLWAY; WAYNE 2026-03-10 2026-07-07

Every mention

DateDocumentProjectWhat the document says about it
2026-07-07 TEAC
Item 12 - ComEd Supplemental Projects p. 12
Customer in Grayslake “Spaulding to Hanover Tap Red”
138kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this