Blain Substation
Named in 3 PJM planning documents for 1 project, from July 17, 2026 to October 6, 2026.
Existingdescribed as
PENELECzone
115 kVkV as printed
3mentions
Also printed as: Blain Switching Station
PJM interconnection queue
A PJM queue substation page has the same name: Blain (PA) — 2 queue requests filed, 0 active.
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Reeds Gap Switching Station – Blain115 kV Line Rebuild PN-2020-013 · s3985.1 |
Not printed | $36.80M | 12/15/2029 | Not printed | 2026-10-06 TEAC |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-06 | TEAC Informational Only - Penelec Local Plan Submission of Supplemental Projects for 2026 p. 31 |
Reeds Gap Switching Station – Blain115 kV Line Rebuild | “to Blain Switching Station on the Lewiston - Shade Gap 115 kV Line.” |
| 2026-10-01* | SRRTEP Mid-Atlantic Penelec local plan submission for 2026 RTEP p. 31 |
Reeds Gap Switching Station – Blain115 kV Line Rebuild | “line from Reeds Gap Switching Station to Blain Switching Station” |
| 2026-07-17 | SRRTEP Mid-Atlantic Item 04 - Penelec Supplemental Projects p. 8 |
Reeds Gap Switching Station – Blain115 kV Line Rebuild | No role wording 115 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.