Reeds Gap Substation

Named in 3 PJM planning documents for 1 project, from July 17, 2026 to October 6, 2026.

Existingdescribed as
PENELECzone
115 kVkV as printed
3mentions

Also printed as: Reeds Gap Switching Station · Reed's Gap Switching Station

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Reeds Gap Switching Station – Blain115 kV Line Rebuild
PN-2020-013 · s3985.1
Not printed $36.80M 12/15/2029 Not printed 2026-10-06
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - Penelec Local Plan Submission of Supplemental Projects for 2026 p. 31
Reeds Gap Switching Station – Blain115 kV Line Rebuild “Replace CT's and substation conductor at Reed's Gap Switching Station on line terminal to Shade Gap Substation.”
115 kV
2026-10-01* SRRTEP Mid-Atlantic
Penelec local plan submission for 2026 RTEP p. 30
Reeds Gap Switching Station – Blain115 kV Line Rebuild “Rebuild and reconductor 9.9 miles of 115 kV line from Reeds Gap Switching Station”
115 kV
2026-07-17 SRRTEP Mid-Atlantic
Item 04 - Penelec Supplemental Projects p. 8
Reeds Gap Switching Station – Blain115 kV Line Rebuild “Replace CT's and substation conductor at Reed's Gap Switching Station on line terminal to Shade Gap Substation.”
115 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.