Substation Scout

Sunbury

Named in 3 PJM planning documents for 3 projects, from December 8, 2025 to October 6, 2026.

Existingdescribed as
PJM system-widezone
500 kVkV as printed
3mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
MAAC Regional Cluster: Baseline
b4036.1
Not printed $1789.39M 6/1/2032 Not printed 2026-01-06
TEAC
B4036.17 Scope Change: Baseline
B4036.17
Not printed $30M 6/1/2032 Not printed 2026-10-06
TEAC
MAAC Regional Cluster: Baseline
2025-W1-237
Not printed $1738.6M 6/1/2031 Not printed 2025-12-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
$4.98M → $30M 2026-10-06 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Item 16 - Reliability Analysis Update - Presentation p. 15
B4036.17 Scope Change: Baseline “Reconfigure the Sunbury 500 kV substation”
500 kV
2026-01-06 TEAC
Item 09 - Reliability Analysis Update p. 23
MAAC Regional Cluster: Baseline “Install two new 500 kV circuit breakers with 63 kA, 5,000 Amps rating in transformer T24 and T25 bay.”
500 kV
2025-12-08 TEAC
Item 11 - Reliability Analysis Update p. 52
MAAC Regional Cluster: Baseline “Sunbury 500 kV substation upgrades”
500 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.