Substation Scout

Clifton Sub

Named in 2 PJM planning documents for 2 projects, from January 7, 2025 to December 8, 2025.

Existingdescribed as
PJM system-widezone
230.kVkV as printed
2mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
PJM Selected Solution: Breaker Upgrades
b4000.110
Not printed $100.85 M 6/1/2029 Not printed 2025-01-07
TEAC
2025W1 – Regional Cluster Preferred Solution: Breaker Upgrades Not printed $18.5 M 6/1/2030 Not printed 2025-12-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate $100.85 M → $10.06 M 2025-01-07 2025-04-01
Cost estimate
prior value printed on the same page
$11.5 M → $10.06 M 2025-04-01 2025-04-01
Substations named ASHBURN; BEAUMEADE; BRADDOCK; BRAMBLETON; BRISTERS; BULL RUN; BUTTERMILK; CABIN RUN; CARSON; CLIFTON; DOUBS; EVERGREEN MILLS; GOOSE CREEK; LADYSMITH; LIBERTY; LOCKRIDGE; LOUDOUN; MARSH RUN; MORRISVILLE; MOSBY; MT STORM; NIMBUS; NIVO 1; NORTH ANNA; PARAGON PARK; PLEASANTVIEW; REMINGTON; ROUNDTABLE; VINT HILL; YARDLEY → DOUBS 2025-01-07 2025-04-01

Every mention

DateDocumentProjectWhat the document says about it
2025-12-08 TEAC
Item 11 - Reliability Analysis Update p. 123
2025W1 – Regional Cluster Preferred Solution: Breaker Upgrades “Clifton Sub 230.kV 3 63kA 80kA 3”
230.kV
2025-01-07 TEAC
Item 12 - Reliability Analysis Update p. 81
PJM Selected Solution: Breaker Upgrades No role wording
230.kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this