Cheriton S/S

Named in 1 PJM planning document for 1 project, on December 11, 2025.

Newdescribed as
PJM system-widezone
—kV as printed
1mentions

Described as new: “Cheriton S/S is a new under construction station” — source, page 4

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
ODEC Transmission Zone b3134 Cost Update
b3134
Not printed $43.4M 12/31/2027 Not printed 2025-12-11
SRRTEP Mid-Atlantic

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
$22M → $43.4M 2025-12-11 2025-12-11

Every mention

DateDocumentProjectWhat the document says about it
2025-12-11 SRRTEP Mid-Atlantic
Item 15 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 4
ODEC Transmission Zone b3134 Cost Update “Cheriton S/S is a new under construction station”