Thornburg

Named in 4 PJM planning documents for 7 projects, from May 8, 2026 to October 6, 2026.

Newdescribed as
DOMzone
500/230kV, 500kVkV as printed
10mentions

Described as new: “new substation called Thornburg” — source, page 14

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Dominion Transmission Zone: Baseline New 500kV Line North Anna - Thornburg - Bristers
b4000.344 & b4000.345
Not printed $661.63M 9/16/2030 Not printed 2026-05-08
TEAC
Thornburg 500/230kV Substation (Line #568 Ladysmith – Possum Point Cut-In)
b4000.351 & b4000.352
Not printed $7.2M 9/16/2030 Not printed 2026-10-06
TEAC
Thornburg 500/230kV Substation (Bypass Elmont & Possum Point 500kV)
b4053.34
Not printed $1M 6/1/2032 Not printed 2026-10-06
TEAC
Dominion Transmission Zone: Supplemental Do No Harm Analysis
DOM-2023-0016 · s3731
Engineering $27 M 05/31/2025 248.0 MW 2026-10-06
TEAC
Orrock (Matta) 230kV Delivery - DEV
DOM-2023-0023 · s3990
Engineering $25.5 M 11/15/2026 300 MW 2026-10-06
TEAC
Dominion Transmission Zone: Supplemental Operational Flexibility and Efficiency
DOM-2024-0051 · s3999
Engineering $185M 12/31/2030 Not printed 2026-10-06
TEAC
Install 230 kV Conductor on North Anna to Bristers Structures
DOM-2026-0022 · s4032
Engineering $33.75 M Q4 2030 Not printed 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
$704.25 M → $704.33 M 2025-01-07 2025-01-07
Cost estimate
prior value printed on the same page
$571.63M → $661.63M 2026-05-08 2026-05-08
Cost estimate $704.33 M → $661.63M 2025-01-07 2026-05-08
In-service date 6/1/2029 → 9/16/2030 2025-01-07 2026-05-08
Substations named ELMONT; KRAKEN; LADYSMITH; NORTH ANNA; POSSUM POINT; YEAT → AQUIA HARBOR; BRISTERS; KRAKEN; LADYSMITH; NORTH ANNA; STAFFORD; THORNBURG 2025-01-07 2026-05-08
Cost estimate $27.0 M → $450.0M 2025-04-01 2026-06-02
Cost estimate $450.0M → $27 M 2026-06-02 2026-10-06
In-service date 05/31/2025 → 07/01/2029 2025-04-01 2026-06-02
In-service date 07/01/2029 → 05/31/2025 2026-06-02 2026-10-06
Substations named ALLMAN; ELMONT; FOUR RIVERS; FREDERICKSBURG; KRAKEN; LADYSMITH; LADYSMITH CT; LEES HILL; N DOSWELL; NEW POST; PINEWOOD; RUTHER GLEN; ST JOHNS → ALLMAN; CHANCELLOR; ELMONT; FOUR RIVERS; FREDERICKSBURG; KRAKEN; LADYSMITH; LADYSMITH CT; LEES HILL; N DOSWELL; NEW POST; PINEWOOD; POSSUM POINT; RUTHER GLEN; ST JOHNS; THORNBURG 2025-04-01 2026-06-02
Substations named ALLMAN; CHANCELLOR; ELMONT; FOUR RIVERS; FREDERICKSBURG; KRAKEN; LADYSMITH; LADYSMITH CT; LEES HILL; N DOSWELL; NEW POST; PINEWOOD; POSSUM POINT; RUTHER GLEN; ST JOHNS; THORNBURG → ALLMAN; ELMONT; FOUR RIVERS; FREDERICKSBURG; KRAKEN; LADYSMITH; LADYSMITH CT; NEW POST; PINEWOOD; POSSUM POINT; RUTHER GLEN; ST JOHNS; THORNBURG 2026-06-02 2026-10-06
Substations named KRAKEN; LADYSMITH CT; MATTA → LADYSMITH CT; ORROCK MATTA; THORNBURG 2025-09-09 2026-10-06
Cost estimate
prior value printed on the same page
$108M → $165M 2026-06-02 2026-06-02
Cost estimate Transmission: $108M; Substation: $15M → $165M 2025-06-05 2026-06-02
Cost estimate $165M → $185M 2026-06-02 2026-10-06
Status conceptual (Conceptual) → engineering (Engineering) 2025-06-05 2026-06-02
Substations named BRISTERS; ELMONT; FREDERICKSBURG; NORTH ANNA; THORNBURG → BRISTERS; NORTH ANNA; THORNBURG 2026-06-02 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2026 p. 101
Orrock (Matta) 230kV Delivery - DEV No role wording
2026-10-06 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2026 p. 51
Dominion Transmission Zone: Supplemental Do No Harm Analysis “Expand Thornburg (fka Kraken) 500kV Switching Station”
500kV
2026-10-06 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2026 p. 69
Dominion Transmission Zone: Supplemental Operational Flexibility and Efficiency “Terminate one 230kV conductor rated at 1573 MVA at Thornburg and Chickahominy.”
2026-10-06 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2026 p. 81
Install 230 kV Conductor on North Anna to Bristers Structures No role wording
2026-10-06 TEAC
Item 16 - Reliability Analysis Update - Presentation p. 8
Thornburg 500/230kV Substation (Line #568 Ladysmith – Possum Point Cut-In) No role wording
500/230kV
2026-10-06 TEAC
Item 16 - Reliability Analysis Update - Presentation p. 9
Thornburg 500/230kV Substation (Bypass Elmont & Possum Point 500kV) “removing line terminations at Thornburg (bypassing the Thornburg substation)”
500/230kV
2026-06-02 TEAC
Item 11 - DOM Supplemental Projects p. 10
Dominion Transmission Zone: Supplemental Do No Harm Analysis “Expand Thornburg (fka Kraken) 500kV Switching Station”
500kV
2026-06-02 TEAC
Item 11 - DOM Supplemental Projects p. 14
Dominion Transmission Zone: Supplemental Operational Flexibility and Efficiency No role wording
2026-06-02 TEAC
Item 11 - DOM Supplemental Projects p. 7
Install 230 kV Conductor on North Anna to Bristers Structures No role wording
2026-05-08 TEAC
Item 10 - Reliability Analysis Update p. 14
Dominion Transmission Zone: Baseline New 500kV Line North Anna - Thornburg - Bristers “new substation called Thornburg”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.