Named in 3 PJM planning documents for 1 project, from December 11, 2025 to October 6, 2026.

Existingdescribed as
PENELECzone
138 kVkV as printed
3mentions

Also printed as: Grand Point Substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Grand Point – Roxbury 138kV Line
PN-2024-012 · s3987.1
Not printed $17.94M 06/15/2029 Not printed 2026-10-06
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - Penelec Local Plan Submission of Supplemental Projects for 2026 p. 35
Grand Point – Roxbury 138kV Line “At Grand Point Substation (APS): Replace substation conductor, circuit breaker, install surge arrestors and ground switch, and revise relay settings. (s3880.1)”
138 kV
2026-10-01* SRRTEP Mid-Atlantic
Penelec local plan submission for 2026 RTEP p. 35
Grand Point – Roxbury 138kV Line “At Grand Point Substation (APS): Replace substation conductor”
2025-12-11 SRRTEP Mid-Atlantic
Item 10 - PENELEC Supplemental Projects p. 6
Grand Point – Roxbury 138kV Line “At Grand Point Substation (APS): Replace substation conductor, circuit breaker, install surge arrestors and ground switch, and revise relay settings.”
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.