Substation Scout

Craigsville Substation

Named in 3 PJM planning documents for 1 project, from December 11, 2025 to October 6, 2026.

Existingdescribed as
DOMzone
115 kVkV as printed
3mentions

Also printed as: Craigsville

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Customer Load Request
DOM-2025-0093 · s3897
Conceptual $0.84M 12/31/2029 Not printed 2026-10-06
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2026 p. 32
Customer Load Request “replace the fuse with circuit switcher at Craigsville Substation”
115 kV
2026-03-18 SRRTEP Mid-Atlantic
Item 05 - DOM Supplemental Projects p. 11
Customer Load Request “Replace the fuse and the switch on the high side of TX#1, with a 1200 A circuit switcher and 2000 A switch at the Craigsville substation.”
115 kV
2025-12-11 SRRTEP Southern
Item 02 - DOM Supplemental Projects p. 5
Customer Load Request “replace the fuse with circuit switcher at Craigsville Substation”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.