Substation Scout

Susquehanna

Named in 1 PJM planning document for 1 project, on December 8, 2025.

Existingdescribed as
PJM system-widezone
230.kVkV as printed
1mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
2025W1 – Regional Cluster Preferred Solution: Breaker Upgrades Not printed $18.5 M 6/1/2030 Not printed 2025-12-08
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2025-12-08 TEAC
Item 11 - Reliability Analysis Update p. 122
2025W1 – Regional Cluster Preferred Solution: Breaker Upgrades “Susquehanna 230.kV 6 50 63 4.5”
230.kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this