Kellam S/S

Named in 1 PJM planning document for 1 project, on December 11, 2025.

Existingdescribed as
PJM system-widezone
69 kVkV as printed
1mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
ODEC Transmission Zone b3134 Cost Update
b3134
Not printed $43.4M 12/31/2027 Not printed 2025-12-11
SRRTEP Mid-Atlantic

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
$22M → $43.4M 2025-12-11 2025-12-11

Every mention

DateDocumentProjectWhat the document says about it
2025-12-11 SRRTEP Mid-Atlantic
Item 15 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 4
ODEC Transmission Zone b3134 Cost Update “Build a new single circuit 69 kV overhead line from Kellam S/S”
69 kV