Substation Scout

Buttermilk Falls

Named in 3 PJM planning documents for 3 projects, from December 8, 2025 to October 6, 2026.

Not stateddescribed as
PJM system-widezone
765kVkV as printed
3mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
MAAC Regional Cluster: Baseline
b4036.1
Not printed $1789.39M 6/1/2032 Not printed 2026-01-06
TEAC
B4036.15 Scope Change: Baseline
B4036.15
Not printed $131.53M 6/1/2032 Not printed 2026-10-06
TEAC
MAAC Regional Cluster: Baseline
2025-W1-237
Not printed $1738.6M 6/1/2031 Not printed 2025-12-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
$9.95M → $131.53M 2026-10-06 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Item 16 - Reliability Analysis Update - Presentation p. 13
B4036.15 Scope Change: Baseline No role wording
2026-01-06 TEAC
Item 09 - Reliability Analysis Update p. 22
MAAC Regional Cluster: Baseline “Construct a new single circuit 765kV transmission line between Kammer and proposed Buttermilk Falls substations.”
765kV
2025-12-08 TEAC
Item 11 - Reliability Analysis Update p. 35
MAAC Regional Cluster: Baseline “new 765/500 kV substation (Buttermilk Falls”
765kV