Substation Scout

Hunlock Creek Substation

Named in 1 PJM planning document for 1 project, on January 15, 2026.

Not stateddescribed as
UGIzone
—kV as printed
1mentions

PJM interconnection queue

A PJM queue substation page has the same name: Hunlock Creek (PA) — 4 queue requests filed, 2 active.

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
UGI-2026-0001 Not printed Not printed Q4 of 2027 200MW 2026-01-15
SRRTEP Mid-Atlantic

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date Q4 of 2027 → 09/30/2029 2026-01-15 2026-03-10
Substations named HUNLOCK CREEK → MOUNTAIN; NEWPORT 2026-01-15 2026-03-10

Every mention

DateDocumentProjectWhat the document says about it
2026-01-15 SRRTEP Mid-Atlantic
Item 04 - UGI Supplemental Projects p. 3
UGI-2026-0001 No role wording

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this