Wolf Lake

Named in 1 PJM planning document for 1 project, on January 16, 2026.

Not stateddescribed as
COMEDzone
138 kVkV as printed
1mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
NIPSCO Customer in Chicago
ComEd-2025-027
Engineering $ 0M 6/1/2027 260 MW 2026-01-16
SRRTEP Western

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Status engineering (Engineering) → cancelled (Withdraw Need) 2026-01-16 2026-09-18

Every mention

DateDocumentProjectWhat the document says about it
2026-01-16 SRRTEP Western
Item 05 - ComEd Supplemental Projects p. 6
NIPSCO Customer in Chicago No role wording
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.