Substation Scout

Ringing Rocks

Named in 2 PJM planning documents for 1 project, on November 12, 2026.

Work described at itdescribed as
METEDzone
—kV as printed
2mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
North Boyertown Substation
ME-2024-024
Conceptual $32.26 M 05/25/2028 Not printed 2026-11-12
SRRTEP Mid-Atlantic

Other substations in this project

“North Boyertown Substation” also names 5 other substations, with what the most recent document says about each.

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named NORTH BOYERTOWN → CARSONIA; EAST TOPTON; LYONS; NORTH BOYERTOWN; RINGING ROCKS; WEST BOYERTOWN 2024-12-12 2026-11-12

Every mention

DateDocumentProjectWhat the document says about it
2026-11-12 SRRTEP Mid-Atlantic
Item 03 - MetEd Supplemental Projects Presentation p. 6
North Boyertown Substation “Update relay settings at Carsonia, West Boyertown, East Topton, Ringing Rocks, and Lyons substations.”
2026-11-12 SRRTEP Mid-Atlantic
Item 04 - MetEd Supplemental Projects Presentation p. 6
North Boyertown Substation “Update relay settings at Carsonia, West Boyertown, East Topton, Ringing Rocks”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first