Substation Scout

Macdade

Named in 1 PJM planning document for 1 project, on December 1, 2026.

Existingdescribed as
PECOzone
230kVkV as printed
1mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
PE-2026-019 Not printed Not printed Not printed Not printed 2026-12-01
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-12-01 TEAC
Item 06 - PECO Supplemental Projects Presentation p. 3
PE-2026-019 “The Macdade 230kV 467 motor operated disconnect has structures which are located below the flood plane level”
230kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.