Trego Substation

Named in 3 PJM planning documents for 1 project, from September 18, 2025 to October 6, 2026.

Existingdescribed as
DOMzone
115/12.5kVkV as printed
3mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Loading Exceeds Nameplate Rating, Voltage Island
DOM-2025-0036 · s3893
Under construction $0.7M 04/30/2026 Not printed 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date 04/30/2026 → 11/16/2026 2025-09-18 2026-02-12
In-service date 11/16/2026 → 04/30/2026 2026-02-12 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2026 p. 38
Loading Exceeds Nameplate Rating, Voltage Island “installation of one three-phase 9 MVA, 115/12.5kV transformer, and replace the existing transformer with a 9 MVA, 115/4.16kV transformer at Trego Substation”
115/12.5kV
2026-02-12 SRRTEP Southern
Item 07 - DOM Supplemental Projects p. 6
Loading Exceeds Nameplate Rating, Voltage Island “replacing the existing transformer with a 9 MVA, 115/4.16kV transformer to feed Circuit 831 at Trego Substation”
115/12.5kV
2025-09-18 SRRTEP Southern
Item 06 - DOM Supplemental Projects p. 8
Loading Exceeds Nameplate Rating, Voltage Island “replacing the existing transformer with a 9 MVA, 115/4.16kV transformer to feed Circuit 831 at Trego Substation”