Reed Farm (South Fork)

Named in 1 PJM planning document for 1 project, on September 9, 2025.

Existingdescribed as
DOMzone
—kV as printed
1mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Do No Harm Analysis
DOM-2023-0002-DNH
Conceptual $20.0 M 12/31/2029 Not printed 2025-09-09
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named AZALEA LANE; BRAMBLETON; LOUDOUN; RACEFIELD; REED FARM SOUTH FORK → AZALEA LANE; BRAMBLETON; LOUDOUN; RACEFIELD; REED FARM SOUTH FORK SUBSTATIONS 2025-09-09 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2025-09-09 TEAC
Item 14 - DOM Supplemental Projects p. 9
Do No Harm Analysis “At Reed Farm (South Fork) substation, install the remaining two (2) breakers”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.