Apple Ave subs

Named in 1 PJM planning document for 1 project, on September 19, 2025.

Existingdescribed as
AMPTzone
—kV as printed
1mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Orrville 2nd Source
AMPT-2023-004
Not printed $71.7 M AMPT portion (10/2028); FE portion (08/2030); AEP portion (10/2028) 60 MW 2025-09-19
SRRTEP Western

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate $71.7 M → $68.741M 2025-09-19 2026-10-06
In-service date AMPT portion (10/2028); FE portion (08/2030); AEP portion (10/2028) → 8/30/2030 2025-09-19 2026-10-06
Status unknown (Engineering (AMPT), Conceptual (AEP and FE)) → engineering (Engineering) 2025-09-19 2026-10-06
Substations named APPLE AVE; EAST WOOSTER; MINERAL SPRINGS; NEW FE; POWER PLANT → APPLE AVE; EAST WOOSTER; MINERAL SPRINGS; STAR CLOVERDALE 2026-10-06 Not reported
Substations named APPLE AVE; CLOVERDALE; EAST WOOSTER; MINERAL SPRINGS; POWER PLANT; STAR → APPLE AVE; EAST WOOSTER; MINERAL SPRINGS; POWER PLANT Not reported Not reported
Substations named APPLE AVE; EAST WOOSTER; MINERAL SPRINGS; STAR CLOVERDALE → APPLE AVE; CLOVERDALE; EAST WOOSTER; MINERAL SPRINGS; POWER PLANT; STAR Not reported Not reported
Substations named APPLE AVE; APPLE AVE SUBS; E WOOSTER; EAST WOOSTER; MINERAL SPRINGS → APPLE AVE; EAST WOOSTER; MINERAL SPRINGS 2025-09-19 2026-10-06
Substations named APPLE AVE; EAST WOOSTER; MINERAL SPRINGS → APPLE AVE; CLOVERDALE; EAST WOOSTER; MINERAL SPRINGS; NEW FE; POWER PLANT; STAR 2026-10-06 2026-10-06
Substations named APPLE AVE; CLOVERDALE; EAST WOOSTER; MINERAL SPRINGS; NEW FE; POWER PLANT; STAR → APPLE AVE; EAST WOOSTER; MINERAL SPRINGS; NEW FE; POWER PLANT 2026-10-06 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2025-09-19 SRRTEP Western
Item 01 - AMPT Supplemental Projects p. 4
Orrville 2nd Source “Install new revenue metering at Mineral Springs and Apple Ave subs.”