Named in 4 PJM planning documents for 2 projects, from June 5, 2025 to October 6, 2026.

Existingdescribed as
DOMzone
115kVkV as printed
4mentions

Also printed as: Turner substation

PJM interconnection queue

A PJM queue substation page has the same name: Turner (VA) — 2 queue requests filed, 1 active.

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Dominion Transmission Zone: Supplemental Equipment Material Condition, Performance and Risk
DOM-2025-0026 · s3915
Engineering $160M 12/31/2028 Not printed 2026-10-06
TEAC
Equipment Material Condition, Performance and Risk
DOM-2025-0026 Update
Engineering $160M 12/31/2028 Not printed 2025-09-09
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate $54M → $160M 2025-07-08 2026-10-06
Substations named CHESTERFIELD; CHICKAHOMINY; LADYSMITH; LANEXA; POSSUM POINT; PROVIDENCE FORGE; TURNER → CHESTERFIELD; LANEXA; PROVIDENCE FORGE; TURNER 2025-06-05 2025-07-08
Substations named CHESTERFIELD; LANEXA; PROVIDENCE FORGE; TURNER → CHESTERFIELD; CHICKAHOMINY; LANEXA; PROVIDENCE FORGE; TURNER 2025-07-08 2026-10-06
Cost estimate
prior value printed on the same page
$54M → $160M 2025-09-09 2025-09-09

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2026 p. 94
Dominion Transmission Zone: Supplemental Equipment Material Condition, Performance and Risk “115kV tap at Turner substation”
115kV
2025-09-09 TEAC
Item 14 - DOM Supplemental Projects p. 3
Equipment Material Condition, Performance and Risk No role wording
115kV
2025-07-08 TEAC
Item 10 - DOM Supplemental Projects p. 3
Dominion Transmission Zone: Supplemental Equipment Material Condition, Performance and Risk No role wording
115kV
2025-06-05 TEAC
Item 08 - DOM Supplemental Projects p. 4
Dominion Transmission Zone: Supplemental Equipment Material Condition, Performance and Risk No role wording
115kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this