Cromby

Named in 2 PJM planning documents for 1 project, from April 7, 2026 to May 8, 2026.

Existingdescribed as
PECOzone
230kV, 138kV and 69kVkV as printed
2mentions

PJM interconnection queue

A PJM queue substation page has the same name: Cromby (PA) — 3 queue requests filed, 0 active.

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
PE-2026-006 Engineering $115 M 06/01/2033 Not printed 2026-05-08
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-05-08 TEAC
Item 07 - PECO Supplemental Projects p. 5
PE-2026-006 “Rebuild existing Cromby substation”
230kV, 138kV and 69kV
2026-04-07 TEAC
Item 08 - PECO Supplemental Projects p. 6
PE-2026-006 “The Cromby substation consists of 230kV, 138kV and 69kV facilities that don’t meet current Exelon substation design standards.”
230kV, 138kV and 69kV