Substation Scout

Naamans

Named in 1 PJM planning document for 1 project, on March 13, 2025.

Not stateddescribed as
DPLzone
69kVkV as printed
1mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
DPL Transmission Zone: b3143 Scope and Cost Change
b3143
Not printed $21M 10/31/2026 Not printed 2025-03-13
SRRTEP Mid-Atlantic

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
$5.5 M → $21M 2025-03-13 2025-03-13

Every mention

DateDocumentProjectWhat the document says about it
2025-03-13 SRRTEP Mid-Atlantic
Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 3
DPL Transmission Zone: b3143 Scope and Cost Change No role wording
69kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this