Cly
Named in 6 PJM planning documents for 3 projects, from June 12, 2025 to October 16, 2026.
Existingdescribed as
METEDzone
115 kVkV as printed
6mentions
Also printed as: Cly Substation
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Round Top Substation ME-2023-020 · s3733.1 |
Not printed | $22.1M | 6/2/2028 | 18.8 MW | 2026-10-06 TEAC |
| Cly – Smith Street 115 kV 978 Line Customer Connection ME-2024-017 |
Conceptual | $4.71 | 5/1/2028 | Not printed | 2025-06-12 SRRTEP Mid-Atlantic |
| Cly - Smith Street 115 kV Line - Customer Connection ME-2026-011 |
Conceptual | $2.25 M | 06/01/2028 | approximately 10 MW | 2026-10-16 SRRTEP Mid-Atlantic |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Substations named | ALLEN; CLY; DILLSBURG; GARDNERS; NEWBERRY; ROUND TOP; ROUNDTOP → ALLEN; CLY; GARDNERS; ROUND TOP; ROUNDTOP | 2025-08-14 | 2026-10-06 |
| In-service date | 2/28/2029 → 06/01/2028 | 2026-08-13 | 2026-10-16 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-16 | SRRTEP Mid-Atlantic Item 07 - MetEd Supplemental Projects Presentation p. 4 |
Cly - Smith Street 115 kV Line - Customer Connection | “Adjust relay settings at Cly and Smith Street substations.” 115 kV |
| 2026-10-07* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2026 RTEP p. 3 |
Round Top Substation | “Revise relay settings at Gardners, Cly, and Allen substations.” |
| 2026-10-06 | TEAC Informational Only - MetEd Local Plan Submission of Supplemental Projects for 2026 p. 3 |
Round Top Substation | “Revise relay settings at Gardners, Cly, and Allen substations” |
| 2026-08-13 | SRRTEP Mid-Atlantic Item 03 - MetEd Supplemental Projects p. 4 |
Cly - Smith Street 115 kV Line - Customer Connection | No role wording 115 kV |
| 2025-08-14 | SRRTEP Mid-Atlantic Item 05 - MetEd Supplemental Projects p. 6 |
Round Top Substation | “Revise relay settings at Gardners, Cly, and Allen substations.” |
| 2025-06-12 | SRRTEP Mid-Atlantic Item 02 - MetEd Supplemental Projects p. 4 |
Cly – Smith Street 115 kV 978 Line Customer Connection | “Modify relay settings at Smith Street and Cly substations” |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.