Cly

Named in 6 PJM planning documents for 3 projects, from June 12, 2025 to October 16, 2026.

Existingdescribed as
METEDzone
115 kVkV as printed
6mentions

Also printed as: Cly Substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Round Top Substation
ME-2023-020 · s3733.1
Not printed $22.1M 6/2/2028 18.8 MW 2026-10-06
TEAC
Cly – Smith Street 115 kV 978 Line Customer Connection
ME-2024-017
Conceptual $4.71 5/1/2028 Not printed 2025-06-12
SRRTEP Mid-Atlantic
Cly - Smith Street 115 kV Line - Customer Connection
ME-2026-011
Conceptual $2.25 M 06/01/2028 approximately 10 MW 2026-10-16
SRRTEP Mid-Atlantic

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named ALLEN; CLY; DILLSBURG; GARDNERS; NEWBERRY; ROUND TOP; ROUNDTOP → ALLEN; CLY; GARDNERS; ROUND TOP; ROUNDTOP 2025-08-14 2026-10-06
In-service date 2/28/2029 → 06/01/2028 2026-08-13 2026-10-16

Every mention

DateDocumentProjectWhat the document says about it
2026-10-16 SRRTEP Mid-Atlantic
Item 07 - MetEd Supplemental Projects Presentation p. 4
Cly - Smith Street 115 kV Line - Customer Connection “Adjust relay settings at Cly and Smith Street substations.”
115 kV
2026-10-07* SRRTEP Mid-Atlantic
Met-Ed local plan submission for 2026 RTEP p. 3
Round Top Substation “Revise relay settings at Gardners, Cly, and Allen substations.”
2026-10-06 TEAC
Informational Only - MetEd Local Plan Submission of Supplemental Projects for 2026 p. 3
Round Top Substation “Revise relay settings at Gardners, Cly, and Allen substations”
2026-08-13 SRRTEP Mid-Atlantic
Item 03 - MetEd Supplemental Projects p. 4
Cly - Smith Street 115 kV Line - Customer Connection No role wording
115 kV
2025-08-14 SRRTEP Mid-Atlantic
Item 05 - MetEd Supplemental Projects p. 6
Round Top Substation “Revise relay settings at Gardners, Cly, and Allen substations.”
2025-06-12 SRRTEP Mid-Atlantic
Item 02 - MetEd Supplemental Projects p. 4
Cly – Smith Street 115 kV 978 Line Customer Connection “Modify relay settings at Smith Street and Cly substations”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.