Substation Scout

Marion

Named in 1 PJM planning document for 1 project, on July 8, 2025.

Existingdescribed as
PSEGzone
345 kVkV as printed
1mentions

PJM interconnection queue

A PJM queue substation page has the same name: Marion (NJ) — 4 queue requests filed, 3 active.

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Cancellation of b2436.90
b2436.90
Cancelled $38.25M Not printed Not printed 2025-07-08
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2025-07-08 TEAC
Item 11 - Reliability Analysis Update p. 15
Cancellation of b2436.90 “Relocate Farragut - Hudson "B" and "C" 345 kV circuits to Marion 345 kV and any associated substation upgrades”
345 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this