Named in 1 PJM planning document for 1 project, on July 8, 2025.

Existingdescribed as
PPLzone
230 kVkV as printed
1mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
2022 W3 Chanceford-Doubs Project Update
b3800.1, b3800.3, b3800.53
Not printed $148.15 M 6/1/2027 Not printed 2025-07-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
$148.15M → $148.15 M 2025-07-08 2025-07-08

Every mention

DateDocumentProjectWhat the document says about it
2025-07-08 TEAC
Item 11 - Reliability Analysis Update p. 18
2022 W3 Chanceford-Doubs Project Update “Rebuild the existing Otter Creek - Conastone 230 kV line to become a double-circuit 500 kV line, operate Conastone circuit at 230 kV initially”
230 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.