Named in 1 PJM planning document for 1 project, on July 18, 2025.

Existingdescribed as
ATSIzone
69 kVkV as printed
1mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Star-Seville (Rittman) 69 kV Line – s1802 Scope Change
s1802
Engineering $36.5 M 12/31/2027 Not printed 2025-07-18
SRRTEP Western

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
$18.6 M → $36.5 M 2025-07-18 2025-07-18

Every mention

DateDocumentProjectWhat the document says about it
2025-07-18 SRRTEP Western
Item 03 - ATSI Supplemental Projects p. 12
Star-Seville (Rittman) 69 kV Line – s1802 Scope Change “Rittman 69 kV Substation – Terminal equipment to be replaced”
69 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.