TMI

Named in 1 PJM planning document for 1 project, on July 8, 2025.

Existingdescribed as
PPLzone
500 kVkV as printed
1mentions

PJM interconnection queue

A PJM queue substation page has the same name: TMI (PA) — 7 queue requests filed, 0 active.

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
2022 W3 Chanceford-Doubs Project Update
b3800.1, b3800.3, b3800.53
Not printed $148.15 M 6/1/2027 Not printed 2025-07-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
$148.15M → $148.15 M 2025-07-08 2025-07-08

Every mention

DateDocumentProjectWhat the document says about it
2025-07-08 TEAC
Item 11 - Reliability Analysis Update p. 18
2022 W3 Chanceford-Doubs Project Update “from the existing TMI-Peach Bottom 500 kV right-of-way”
500 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.