Substation Scout

Valley substation interconnection queue

3 active projects totalling 111.9 MW in the PJM queue, plus 7 with terminal status (shown greyed).

3active projects
111.9active MW
10total filed
Queue IDProjectkVMWResourceStatus
AI1-185 Valley 230 kV 230 210 Battery Withdrawn
AG1-195 Valley 230 kV 230 150 Hybrid Withdrawn
AD1-138 Valley 138 kV 138 65.8 Solar Withdrawn
AD2-020 Southwest Michigan Energy Center 138 61.9 Solar Engineering and Procurement
AE2-325 Southwest Michigan Energy Center 138 31.3 Battery Withdrawn
V4-016 Valley 138kV 138 26 Wind Withdrawn
AF1-161 Decatur Battery Storage 138 25 Battery EP
AG1-109 Decatur Battery Storage 138 25 Battery EP
AI2-340 Valley 138 kV 138 23.1 Solar Withdrawn
U4-041 Valley 13.2kV 13.2 2 Other Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.