Salem-Woodstown substation interconnection queue

1 active project totaling 25.3 MW in the PJM queue, plus 1 with terminal status (shown grayed).

2 PJM queue filings name Salem-Woodstown as the point of interconnection, all in NJ.

Target commercial operation dates as filed run from May 2012 to Sep 2028 (2 filings). 1 active filing targets a date after November 27, 2026.

1active projects
25.3active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG1-254 Fenwick Creek Solar 69 25.3 Hybrid Engineering and Procurement Sep 2028
W4-088 Salem-Woodstown 69kV 69 3.8 Solar Withdrawn May 2012

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Atlantic County, NJ

All 93 PJM queue filings in Atlantic County, NJ, including 6 more substations.

Other PJM queue substations in Salem County, NJ

All 114 PJM queue filings in Salem County, NJ, including 5 more substations.