Ontario substation interconnection queue
2 active projects totalling 7.5 MW in the PJM queue, plus 4 with terminal status (shown greyed).
2active projects
7.5active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AF2-025 | Missouri Avenue Battery Storage Project | 69 | 8 | Battery | Pending Termination |
| I01 | Jersey Atlantic WF | 23 | 7.5 | Wind | In Service |
| K29 | Ontario | n/r | 1.5 | Wind | Withdrawn |
| AB1-177 | Ontario 23kV | 23 | 0 | Battery | Withdrawn |
| AD1-019 | Ontario 23 kV | 23 | 0 | Gas | Withdrawn |
| V3-036 | Midtown Thermal Control Center | 23 | 0 | Gas | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.