Pequest River substation interconnection queue

3 active projects totaling 165.9 MW in the PJM queue, plus 2 with terminal status (shown grayed).

5 PJM queue filings name Pequest River as the point of interconnection, all in NJ.

Target commercial operation dates as filed run from Jun 2007 to Dec 2030 (4 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: JCPL (1 filing).

3active projects
165.9active MW
5total filed
Queue IDProjectkVMWResourceStatusTarget COD
C01-1936 Pequest River 115 kV 115 160 Battery Active Dec 2030
A39 Pequest River 115 kV 115 73 Gas Withdrawn n/r
AE2-317 Pequest River 115 kV 115 48 Solar Withdrawn Jun 2022
N27 Warren County LF 34.5 3.6 Gas In Service Jun 2007
Y2-018 Warren County Landfill 34.5 2.3 Solar In Service May 2016

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

PJM planning mentions

A substation with the same name is named in PJM transmission planning materials: Pequest River (JCPL, 9 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Other PJM queue substations in Warren County, NJ

All 113 PJM queue filings in Warren County, NJ, including 4 more substations.

Other PJM queue substations in Atlantic County, NJ

All 93 PJM queue filings in Atlantic County, NJ, including 6 more substations.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first