Gardners substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name Gardners as the point of interconnection, all in Adams County, PA.

Target commercial operation dates as filed run from Dec 2024 to Dec 2027 (2 filings).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AH2-230 Gardners 115 kV 115 75 Battery Withdrawn Dec 2027
AI1-197 Gardners 13.2 kV 13.2 8 Hybrid Withdrawn Dec 2024

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Same name on other Substation Scout pages

Other sources that print a substation named “Gardners” in PA. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.

Other PJM queue substations in Adams County, PA

All 86 PJM queue filings in Adams County, PA.