Huron substation interconnection queue
2 active projects totalling 8 MW in the PJM queue, plus 4 with terminal status (shown greyed).
2active projects
8active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J05 | Borgata D1 / D2 | 69 | 8 | Gas | In Service |
| AA1-075 | Huron 23kV | 23 | 7.5 | Gas | Withdrawn |
| AB1-030 | Huron 69kV | 69 | 3.5 | Gas | Withdrawn |
| U2-045 | Fishermen's Atlantic City Windfarm (FACW) | 69 | 2.6 | Offshore Wind | Withdrawn |
| W4-063 | Fishermen's Atlantic City Windfarm (FACW) | 69 | 0.7 | Offshore Wind | Withdrawn |
| Y3-012 | Marina Thermal Facility | 69 | 0 | Gas | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.