Claysburg substation interconnection queue

1 active project totalling 9.8 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
9.8active MW
3total filed
Queue IDProjectkVMWResourceStatus
C01-1957 Claysburg 115 kV 115 289.3 Gas Withdrawn
Q56 Claysburg 115kV 115 36 Wind Withdrawn
AF1-140 BL-Diamond Bear Rocks 23 9.8 Solar Suspended

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.