Hunterstown-Lincoln substation interconnection queue
1 active project totaling 53.6 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Hunterstown-Lincoln as the point of interconnection, all in Adams County, PA.
Target commercial operation dates as filed run from Oct 2017 to Feb 2024 (2 filings).
1active projects
53.6active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AB2-071 | Hunterstown-Lincoln 115kV | 115 | 68 | Solar | Withdrawn | Oct 2017 |
| AD1-020 | Adams Solar LLC | 115 | 53.6 | Solar | In Service | Feb 2024 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Adams County, PA
- Hunterstown: 4 active, 2,131.9 MW of 9 filed
- Hamilton: 2 active, 500 MW of 5 filed
- Valley: 3 active, 111.9 MW of 10 filed
- Claysburg: 1 active, 9.8 MW of 3 filed
- Orrtanna: 1 active, 1 MW of 5 filed
- Germantown: none active of 7 filed
- North Hanover: none active of 4 filed
- Watson: none active of 4 filed
- Lincoln: none active of 3 filed
- Oxford: none active of 3 filed
- Gardners: none active of 2 filed
- Gardners-Hunterstown: none active of 2 filed
- Hunterstown-Jackson: none active of 2 filed
- Tidd-Collier: none active of 2 filed
- Wilcox-Paper City: none active of 2 filed